PREDAIOT
Industrial energy facility at night

Case Study & Traction

Methodology Validation Study — Applied to Oman's published 2024 grid data. Results independently verifiable at opendata.gov.om
Simulation case study

862,903 OMR recovered per 500 MW asset

Using PREDAIOT's published methodology on Oman's National Open Data Portal, a 500 MW asset shows 862,903 OMR in additional annual revenue — a 9.1%–15% profitability increase with zero CAPEX.

862,903 OMR

additional annual revenue / 500 MW

9.1%–15%

profitability increase, zero CAPEX

602.3M OMR

Government subsidy 2024 (context)

Published methodology — PREDAIOT, Oman National Open Data Portal, June 2026. opendata.gov.om

Simulation Study

Sinaw-class 500 MW Solar IPP — Economic Decision Gap analysis

Based on official Nama PWP 2022 data · three scenarios compared

Scenario A — Solar only

7,375,230 OMR / year

No storage, standard export

Scenario B — BESS, fixed schedule

8,962,012 OMR / year

Storage + fixed 02:00 / 17:00 schedule

Scenario C — PREDAIOT intelligence

9,921,262 OMR / year

Full economic optimization

Total Economic Decision Gap

2,546,032 OMR / year

C vs A — zero hardware change

Download the case study (PDF)

Simulation study on official Oman government data. Asset is hypothetical with Sinaw-class specifications. All assumptions stated. All sources cited.

Simulation Study

Manah-class 500 MW Solar + 200 MW BESS — arbitrage optimization

Modelled on MIS hourly demand patterns · APSR 2024 pricing

Fixed-schedule arbitrage capture

62.3%

Of theoretical maximum

PREDAIOT arbitrage capture

100%

Of theoretical maximum

Intelligence premium

959,250 OMR / year

Same hardware, different decisions

Annual intelligence premium

959,250 OMR / year

Above standard fixed-schedule BESS

Simulation study. Manah-class specifications based on publicly announced project parameters.

How to read the deliverable

Anatomy of a Decision Gap report

Every PREDAIOT report follows the same five-part structure. No buried charts. No consulting-deck filler. Every claim is traceable to a row in your data and an hour on the published price curve.

01Asset baseline

Your asset's actual dispatch over the analysis window — what it earned, when, against which market price. This is the ground truth, not a model.

02Shadow run

The same hours replayed by the engine using the price-first decision logic. Same hardware. Same constraints. Different decisions.

03Decision Gap

The OMR difference between actual and shadow runs, broken down by leak category — charge timing, discharge window, curtailment absorption.

04Top 20 actions ranked by OMR

The specific hours where the biggest value was on the table. Each row carries date, hour, action taken, recommended action, and OMR delta.

05Recovery roadmap

What changes — process, schedule, or software — would have captured each leak. Estimated lift per change. No software lock-in implied.

Sample report available on request — anonymized, real format. Email chams@preda-iot.com.

Does the number hold?

Sensitivity — stress-testing the gap

A number is only as good as its assumptions. Below: what happens to the published 862,903 OMR / 500 MW figure when we move the dials on price, efficiency, and curtailment. The Decision Gap is robust under stress.

Scenario leverPREDAIOT revenueDecision GapNote
SMP −10%
8,929,136 OMR776,613 OMRLower market prices shrink the absolute gap but not the relative inefficiency.
SMP baseline (9.12 OMR/MWh)
10,304,393 OMR862,903 OMRPublished methodology — Nama PWP 2022 hourly demand.
SMP +10%
11,679,649 OMR949,193 OMRHigher prices widen the gap. Cost of inaction grows.
Round-trip efficiency −5%
10,047,648 OMR819,758 OMRConservative battery degradation assumption. Gap is durable.
Curtailment events −50%
10,021,393 OMR579,903 OMREven halving curtailment capture, the engine still beats a fixed schedule materially.

Sensitivity ranges derived from APSR 2024 SMP variance and standard Li-ion BESS degradation curves. All input assumptions and source citations are listed in the published methodology on opendata.gov.om.

From click to report

What the seven days actually look like

No sales funnel. No "discovery workshop." A defined process with a defined deliverable on a defined date.

  1. Day 0

    5-minute form

    Asset type, size, location. No financials, no NDA pre-conditions. Submit and you get an automatic confirmation.

  2. Within 24h

    Founder call

    Chams reaches out via WhatsApp or email. Confirms the asset profile and the data format that fits your control room.

  3. Day 1–2

    Data handoff

    You share one month of dispatch logs, energy invoices, or operational data. CSV/XLSX works. Macros are rejected. ≤10 MB.

  4. Day 3–6

    Shadow run

    The engine replays your month against published Oman market signals. Every leak is logged with its OMR weight and source row.

  5. Day 7

    Report delivered

    PDF + CSV decision log. Top 20 actions ranked by OMR. Recovery roadmap. Optional 30-minute walkthrough.

  6. After Day 7

    You decide

    No automatic enrollment. If the number is material, we talk pilot or deployment. If not, you keep the report.

Guarantee

If we don't identify at least 20,000 OMR in annual recoverable value — you pay nothing. In writing.

Voices from the industry

Comments from energy professionals in Oman and the GCC — names withheld for privacy.

"The economic inefficiency from sub-optimized dispatch is certainly within a realistic range. Points 2 and 3 — charge timing and discharge optimization — are the hardest to control in practice."

Lead, Renewables & Emerging Technologies — Major Oman Energy Operator

June 2026

"There is significant value in integrating operational monitoring with economic optimization. Operationally correct decisions are not necessarily the most economically efficient."

Control & Monitoring Engineer — Operational Energy Facility, Oman

June 2026

"The methodology should account for DC/AC ratio 1.25 and single-axis tracker with bifacial modules — energy yield will get a huge boost. OETC is investing in standalone BESS targeting 3GW by 2030."

CTO & Director IPP/EPC Renewable Energy — Senior Technical Review

June 2026

Real traction

Ministry Recognition

Methodology published on Oman National Open Data Portal — Ministry of Transport, Communications & IT — June 2026.

Grid Operator Engagement

Meeting with GM Load Dispatch Centre, OETC — operator of Oman's national transmission grid — June 2026.

Government Advisory

Consultation session — SAS Center, Ministry of Transport, Communications & IT — May 2026.

Patent Filed

Economic Decision Engine method — patent application filed. Proprietary dispatch optimization technology.

Expert Technical Review

CTO & Director IPP/EPC Renewable Energy confirmed methodology. Technical corrections incorporated and published.

Industry Engagement

8 direct conversations at Oman Sustainability & Energy Week 2026. Active pipeline across utility-scale energy operators in Oman.

GCC Commercial Discussions

Distribution partnership discussions in progress across GCC renewable energy market.